Started a build for my columbian tegu. Had all the wood cut at home depot and assembled it at the house. Today I'm going to make vent holes on the back and sides, seal the bottom and edges (6inches up) with fiberglass. Then I have to prime and paint. Finally, I will be putting vinyl tile on the bottom and up the sides 6 inches, to make for easy cleaning.
Bookmarks